	<title>Arquivo Cases - Furacon</title>
	<atom:link href="https://www.furacon.com.br/en/cases/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.furacon.com.br/cases/</link>
	<description>Sistemas de cortes e perfurações em concreto ltda</description>
	<lastBuildDate>Tue, 15 Jul 2025 22:13:37 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://www.furacon.com.br/wp-content/uploads/2024/08/favicon.jpg</url>
	<title>Arquivo Cases - Furacon</title>
	<link>https://www.furacon.com.br/cases/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Itaguaí Harbor</title>
		<link>https://www.furacon.com.br/en/cases/itaguai-harbor/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:51:04 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/porto-de-itaguai-rj/</guid>

					<description><![CDATA[<p>Controlled demolition of a "U" shaped pier approximately 230m long, which was demolished using diamond saws and Flat Saw, Wall Saw and Wire Saw equipment (diamond saws and diamond wires respectively), as they have high precision, quality of finish, cleanliness, punctuality and operational safety.</p>
<p>The big challenge was to carry out the demolition without any pieces of concrete falling into the sea.</p>
<p>In this case, we show that the controlled demolition was strategically designed and executed with different systems and equipment together for the successful completion of the work.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/itaguai-harbor/">Itaguaí Harbor</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Controlled demolition of a &#8220;U&#8221; shaped pier approximately 230m long, which was demolished using diamond saws and Flat Saw, Wall Saw and Wire Saw equipment (diamond saws and diamond wires respectively), as they have high precision, quality of finish, cleanliness, punctuality and operational safety.</p>
<p>The big challenge was to carry out the demolition without any pieces of concrete falling into the sea.</p>
<p>In this case, we show that the controlled demolition was strategically designed and executed with different systems and equipment together for the successful completion of the work.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/itaguai-harbor/">Itaguaí Harbor</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Expresso Tiradentes</title>
		<link>https://www.furacon.com.br/en/cases/fura-fila/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:50:40 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/fura-fila/</guid>

					<description><![CDATA[<p>Drilling with Wídea drills for the implementation of a Magnetic Track on the Tiradentes Express Corridor on the stretch between Terminal Mercado and Terminal Sacomã.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/fura-fila/">Expresso Tiradentes</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Drilling with steel drills</p>
<p>Drilling with drill bits is usually used to make starters in concrete or rock structures.</p>
<p>These structures can be: slabs, beams, reinforcement of foundation blocks, columns, etc.</p>
<p>Project: Expresso Tiradentes (Fura Fila) &#8211; SP (2008) Drilling with Wídea drills for the implementation of a Magnetic Track on the Expresso Tiradentes Corridor on the stretch between Terminal Mercado and Terminal Sacomã.</p>
<p>1 3/8&#8243; and 2 1/4&#8243; diameter boreholes were drilled 11 cm deep. In total, more than 7,000 boreholes were drilled.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/fura-fila/">Expresso Tiradentes</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Marginal Tietê Outfall</title>
		<link>https://www.furacon.com.br/en/cases/marginal-tiete-outfall/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:50:12 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/emissario-marginal-tiete/</guid>

					<description><![CDATA[<p>The great challenge of this job was to overcome the volumetric pressure that was very intense inside the outfall, making it difficult to make the cuts and remove the pieces.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/marginal-tiete-outfall/">Marginal Tietê Outfall</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Using the Wire Saw system, which uses diamond wire, Furacon made several cuts in the sewage outfall located on the Marginal Tietê, for the interconnection of a new system, as part of a project by the São Paulo State Government.</p>
<p>After making the cuts, two 3.0 x 3.0m pieces of concrete were removed, about 40 cm thick. You can see the size of these pieces in the photos. The great challenge of this job was to overcome the volumetric pressure that was very intense inside the outfall, making it difficult to make the cuts and remove the pieces.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/marginal-tiete-outfall/">Marginal Tietê Outfall</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Angeloni Supermarket</title>
		<link>https://www.furacon.com.br/en/cases/angeloni-supermarket/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:49:44 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/supermercado-angeloni-criciuma/</guid>

					<description><![CDATA[<p>Controlled demolition of semi-circular Hydraulic Crusher roofs.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/angeloni-supermarket/">Angeloni Supermarket</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Angeloni Supermarket Building &#8211; Criciúma &#8211; SC (2010)</p>
<p>Controlled demolition of semi-circular roofs using the Hydraulic Crusher. The Robot was ideal for this job because its arm has a reach of up to 4.5 m and because it is operated by remote control with bluetooth technology, it gave the operator an excellent view of the entire work area. The roofs were demolished and the adjacent structures remained intact</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/angeloni-supermarket/">Angeloni Supermarket</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Demolition at Height</title>
		<link>https://www.furacon.com.br/en/cases/demolition-at-height/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:49:17 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/demolicao-em-altura-chamine/</guid>

					<description><![CDATA[<p>The aim of this job was to demolish a chimney flanked by two others, using a demolition robot with remote controls.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/demolition-at-height/">Demolition at Height</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Furacon, a specialist in high-rise demolition, was chosen for this challenging project, carried out at a height of 60 meters. For the first time in Brazil, controlled demolition was carried out on a chimney flanked by two others, using a demolition robot with remote controls.</p>
<p>Weighing around 2 tons, the robot was lifted to the top of the chimney to begin demolition, using a methodology specifically developed for this client. The total demolition was carried out in just 5 working days, fully meeting the expectations of the client, who had already experienced major difficulties and frustrations with other contractors.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/demolition-at-height/">Demolition at Height</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cable Subway</title>
		<link>https://www.furacon.com.br/en/cases/cable-subway/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Tue, 04 Jun 2024 06:48:15 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/metro-cable/</guid>

					<description><![CDATA[<p>The challenge faced was the demolition of a gigantic tank called "Hornos de Cal" (Lime Horns). The tank was 30m in diameter and had to be demolished so that a cable car station (Metro Cable) could be built on the site.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/cable-subway/">Cable Subway</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Furacon was chosen internationally for this project, carried out for the Venezuelan government. The challenge faced was the demolition of a gigantic tank called &#8220;Hornos de Cal&#8221;, which was located in the city of Caracas, surrounded by a community called &#8220;La Televisora&#8221;. The tank was 30m in diameter and needed to be demolished so that a cable car station (Metro Cable) could be built on the site.</p>
<p>The location of the tank made it impossible to demolish it by any other method than controlled demolition, as there were houses extremely close to the tank and any alternative to conventional demolition would put hundreds of people and properties at risk.</p>
<p>To solve the issue of the meter cable, the construction company responsible for the work chose Furacon for its renowned experience. The complete demolition of the tank took 65 days.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/cable-subway/">Cable Subway</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Careful demolition of an elevated reservoir</title>
		<link>https://www.furacon.com.br/en/cases/careful-demolition-of-an-elevated-reservoir/</link>
		
		<dc:creator><![CDATA[PWS Master]]></dc:creator>
		<pubDate>Sat, 01 Jun 2024 09:03:10 +0000</pubDate>
				<guid isPermaLink="false">https://www.furacon.com.br/cases/demolicao-cuidadosa-de-reservatorio-elevado/</guid>

					<description><![CDATA[<p>The aim of this job was to demolish an elevated reservoir, which had been condemned, without the use of manual labor because the client did not allow any workers to stand on or under the structure of the reservoir.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/careful-demolition-of-an-elevated-reservoir/">Careful demolition of an elevated reservoir</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The aim of this job was to demolish an elevated reservoir, which had been condemned, without the use of manual labor because the client did not allow any workers to stand on or under the structure of the reservoir.</p>
<p>We designed a metal platform that would be strong enough to withstand the impacts generated by the demolition, where the robot could work on it in complete safety.</p>
<p>To solve the problem of visualizing the demolition of the reservoir&#8217;s calyx, which was 32.0 m high, we placed the operators on an articulated lifting platform 42.0 m high, where we were able to work quite satisfactorily.</p>
<p>After demolishing the chalice, the support structure remained, and now, with a better view, we were able to meet the client&#8217;s requirements and finish the job with professionalism and mastery.</p>
<p>O post <a href="https://www.furacon.com.br/en/cases/careful-demolition-of-an-elevated-reservoir/">Careful demolition of an elevated reservoir</a> apareceu primeiro em <a href="https://www.furacon.com.br/en/">Furacon</a>.</p>
]]></content:encoded>
					
		
		